Tasks and subtasks
iPhone iPad MacA task is the basic unit Locus uses to record a concrete action. A task can stand on its own, belong to a project or a section within a project, and contain several levels of subtasks. This page covers task properties and editing, and how status and hierarchy determine whether a task can be done right now.
On this page
- A task is Active, Completed or Dropped. When you complete or drop a parent task, only subtasks that are still active change with it.
- Locus works out whether each task is available, blocked or unavailable from its status, the project type, its position, its defer date and its action list.
- A subtask’s due date can’t be later than its parent’s, and its defer date can’t be earlier. When a parent is flagged, its subtasks are flagged too.
- On iPhone and iPad, duration, repeat, custom notifications and attachments require Locus Pro.
Task properties
| Property | Description |
|---|---|
| Title | Required. Write it as an action you could start right away, such as “Call the dentist to book an appointment”. |
| Note | Supports Markdown, and links can be tapped. See Notes. |
| Project and section | A task belongs to at most one project and can sit in one of that project’s sections. |
| Action list | One of Next Action, Waiting For or Someday / Maybe, or none. See Action lists. |
| Tags | Add as many tags as you like. See Tags, tag groups and locations. |
| Flag | Marks a task that needs attention. The iPhone Home screen shows flagged tasks by default. |
| Due, plan and defer dates | Each date has its own purpose, and each can be all-day or set to a time. See Dates: plan, due and defer. |
| Duration Pro feature | How long the task is expected to take, up to 24 hours. See Duration. |
| Type | Task or Event. Events use a start and end time. See Events. |
| Repeat Pro feature | Recreates the task on a fixed schedule or after completion. Works with or without dates: a task without a due or plan date gets its next date as a defer date, or can use When Done to repeat as soon as it is completed. See Repeating tasks. |
| Notifications | Active tasks with a due date notify you automatically. On iPhone and iPad you can also add custom notifications Pro feature, or use an alarm on iOS 26 or later. See Reminders, alarms and notifications. |
| Attachments Pro feature | Files of any type, up to 20 MB each. See Attachments. |
| Subtasks | Can be nested several levels deep and set to run in parallel or in sequence. See Subtasks. |
Pro properties
On iPhone and iPad, properties marked Pro can only be newly set with a subscription. If your subscription ends, durations, repeats, notifications and attachments you already set keep working, and you can clear them at any time. The Mac beta currently doesn’t restrict these properties.
Notes
Notes support Markdown, including headings, bold, italic, strikethrough, inline code, code blocks, quotes, numbered and bulleted lists, task-list checkboxes, tables and horizontal rules. On iPhone and iPad, a note is shown formatted; tap it to edit the underlying text. Task-list checkboxes are for display only and can’t be ticked in the formatted view.
Markdown links and plain web addresses in a note can be opened with a tap, including links to other apps such as obsidian://, bear://, things:/// and x-devonthink-item://. Images aren’t displayed; only their alternative text is shown. Scripts in notes never run. Notes on the Mac follow the same rules.
To show notes in task lists, on iPhone and iPad go to Settings › Appearance › Show task notes in list and choose the maximum number of lines. On the Mac, go to Settings › Appearance › Task Note Lines.
Duration
Pro featureDuration is an estimate of how long a task will take. Combined with a custom filter, it helps you find tasks you can finish in a short time.
- iPhone and iPad: When you turn it on, the duration starts at 15 minutes. Use the wheels to pick hours and minutes, or tap a shortcut: 5, 15 or 30 minutes, or 1, 2 or 4 hours.
- Mac: Type a value such as
20,20m,1h30or1:30, or choose a preset between 5 minutes and 8 hours.
The maximum duration is 24 hours. Events don’t have a duration.
Attachments
Pro feature- iPhone and iPad: In the editor, tap Attachment, then choose Add File, Photo Library or Take Photo. Taking a photo requires camera access. Tap an attachment to preview it, or swipe left to delete it.
- Mac: In the inspector’s Attachments area, click + and choose Choose Files… or Paste, or drag files there from the Finder. Click an attachment to open it in Quick Look.
Each attachment can be up to 20 MB, and you can add up to 20 files or photos at a time. If some files can’t be imported, Locus lists them with the reason, and the rest are added as usual.
Events
When you change a task’s type to Event, it represents a fixed block of time, such as a meeting or an appointment.
- iPhone and iPad: Use the Task / Event segmented control at the top of the editor. The Due, Plan, Defer and Duration rows are replaced by a start time and an end time.
- Mac: Click the type button at the top of the inspector (“Type: Task” or “Type: Event”). In the Dates section, Due becomes Starts and Ends.
Events follow these rules:
- The end can’t be earlier than the start, and an event can run past midnight. When you move the start to another day, the end moves with it and the length stays the same.
- Converting a task to an event clears its plan and defer dates. On iPhone and iPad, the start defaults to the existing due time (an all-day due date becomes 9:00 that day), or to the next full hour if there is no due date. The end defaults to one hour after the start.
- An event’s notification is sent at its start time.
- An event can be a subtask and can have subtasks. Sections can’t become events.
Editing a task
On iPhone and iPad

Tap a task to open the editor. On iPhone it opens as a sheet. In the wide layout on iPad and on an unfolded foldable iPhone, it appears in the inspector on the right; if the window is too narrow to fit the inspector beside the list, for example on an iPad mini in portrait, it opens as a sheet instead. To open a blank editor directly, swipe up on the new-task button on the Home screen, or press ⌘N on an iPad with a hardware keyboard.
From top to bottom, the editor contains:
- The Task / Event switch. When you make changes, a confirm button appears at the top right, and the close button at the top left turns into a red cancel button.
- The title, the status circle and the note.
- The properties you’ve set, such as Project, Tags, List, Due, Plan, Defer, Duration, Repeat, Notification, Attachment and Subtasks.
- More: Sub-items Type (Parallel or Sequential), Created Date and Completed Date.
Properties you haven’t set appear as buttons in the bar along the bottom of the editor; tap one to add it. The Subtasks button appears only when you edit an existing task. To clear a project, tags or list, tap the name at the start of that row. The bottom toolbar holds Delete, Convert to Project, the status menu (such as “Status: Active”) and the flag button.
In the wide layout, if the editor in the inspector has unsaved changes when you switch pages, Locus asks whether to discard them.
On the Mac
Double-click a task in a list, or select it and press Space, to show it in the inspector. The inspector contains:
- At the top: the title, the status (Active, Completed, Canceled), the type button and the flag button.
- The note.
- Organize: Project, Tags and Action List.
- Dates: Due, Plan, Defer, Repeat and Duration.
- Subtasks: choose Parallel or Sequential, add subtasks and drag to reorder them. Completed subtasks collapse into a single row.
- Attachments.
Changes in the inspector need to be saved. When there are unsaved changes, Cancel and Save appear at the bottom; press ⌘↩ to save or Esc to cancel. On the Mac you can’t set custom notifications for a task, and there are no alarms. To set dates, projects and tags directly in a list, see the Mac tour.
Statuses
| Status | Meaning |
|---|---|
| Active | The default. The task appears in the relevant lists and in Schedule, and counts towards availability. |
| Completed | The task is done. Locus records the completion time, and the task appears in the Logbook. |
| Dropped | You no longer intend to do it. The task is kept but doesn’t appear in the Logbook. The Mac inspector shows this status as “Canceled”. |
To change a task’s status:
- iPhone and iPad: Tap the circle at the left of a task to complete it, and tap again to make it active. To drop a task, touch and hold it and choose Status, or use the status menu at the bottom of the editor. After selecting several tasks, use More › Status to change them together.
- Mac: Click the completion circle, or select the task and press ⌘.. You can also use the status control at the top of the inspector, or choose Status in the shortcut menu.
You can’t pause a task on its own. When a project is paused, its tasks become unavailable, but their own status doesn’t change.
How status affects subtasks and parents
| Action | Result |
|---|---|
| Complete a parent task | Active subtasks are completed with it. Dropped subtasks stay as they are. |
| Drop a parent task | Active subtasks are dropped with it. Completed subtasks stay as they are. |
| Make a completed parent active again | Subtasks that were completed become active again too. |
| Make a dropped parent active again | Subtasks that were dropped become active again too. |
| Make any task active again | All of its inactive parent tasks become active again. If its project is completed or dropped, the project is reactivated too. |
A parent task isn’t completed automatically when all its subtasks are done, and a project isn’t completed automatically when all its tasks are done.
Completing a repeating task creates the next one; dropping it doesn’t. To skip a single occurrence, use Skip This Occurrence, which isn’t available for tasks that repeat When Done. See Skip This Occurrence.
Subtasks
Any task can contain subtasks, and subtasks can contain subtasks of their own.
- iPhone and iPad: Swipe right on a task and tap Add Subtask, or touch and hold a task and choose Add Subtask. In the editor of an existing task, you can also add subtasks in the Subtasks area. In the Inbox and in projects, drag a task onto another task to make it a subtask.
- Mac: Select a task and press ⇧⌘↩, or choose Add Subtask in the shortcut menu. In the Inbox and in projects, press ⇥ to indent a task under the one above it, and ⇧⇥ to outdent it. You can also add subtasks in the inspector’s Subtasks area.
A new subtask takes its parent’s project, flag, due date, plan date, defer date and action list.
Parallel and sequential
Each task can set how its subtasks are worked on. The default is parallel.
- Parallel: Subtasks are independent and can be done in any order.
- Sequential: Subtasks must be done in the order they’re listed. Each becomes available when the one before it is complete.
On iPhone and iPad, this setting is Sub-items Type under More in the editor. On the Mac it’s in the inspector’s Subtasks area. Projects and sections have their own parallel or sequential setting; see Projects, folders and categories.
Available, blocked and unavailable
- Pick the launch dateCompleted
- Book the venueFirst available
- Send invitationsBlocked
- Write the talkBlocked
- Fix the tapFirst available
- Replace the bedroom bulbAvailable
- Buy curtainsDeferred to Sat
- Landlord replies to repair ticketWaiting
Locus gives every active task one of three availability states:
| Availability | When it applies |
|---|---|
| Available | You can start it now. |
| Blocked | Nothing on the task itself holds it back, but its place in the hierarchy does: it’s in a sequential project or under a sequential parent and something earlier is still open; its parent task isn’t available; or it’s a parallel parent and none of its subtasks are available. |
| Unavailable | The task is completed or dropped; its defer date hasn’t arrived; it’s in Waiting For or Someday / Maybe; or its project is paused, completed or dropped. |
A section always counts as available and never blocks other tasks. Once all of a task’s subtasks are completed or dropped, the task is judged like any other task.
Availability decides which views a task appears in. The Inbox and Next Action show only tasks you can act on by default; switch to Remaining Tasks to see deferred and blocked ones. Project and tag pages offer four views: First Available, Available, Remaining and All. Their meanings are described in the iPhone and iPad tour.
First available
First Available is the single task in each project that Locus picks as the one to do first. It must be available and have no open subtasks, and each of its parents must come first at its own level. A parallel or sequential project has one first available task; in a Single Action List project, each available top-level item gives its own. Tasks outside projects are evaluated separately.
Locus works out First Available automatically, which makes it different from the Next Action list you fill yourself. See First available is not Next Action.
Sections
Sections divide a project’s tasks into parts, such as “Research”, “Build” and “Wrap-up”. A section can only sit directly at the top level of a project, never inside a task or another section.
- Add a section: On iPhone and iPad, open the project and tap Add Section at the bottom. On the Mac, select the project and click Add Section in the toolbar, enter a Section Title, choose Parallel or Sequential, then click Create.
- Edit a section: On iPhone and iPad, tap the section row. On the Mac, select the section and edit it in the inspector.
A section has only two settings, its title and its type (parallel or sequential). It can’t have a note, tags, a flag, dates, a repeat, a duration, an action list, notifications or attachments. Sections aren’t counted as tasks and don’t appear in the Inbox or in search results. Tasks in a section follow the section’s own parallel or sequential setting.
Archiving a section
A section is either active or completed, and you switch between the two by archiving it:
- Archive: On iPhone and iPad, touch and hold the section and choose Archive Section. On the Mac, Control-click the section and choose Archive Section, or select it and press ⌘.. Archiving completes every active task in the section.
- Unarchive: Choose Unarchive Section. Completed tasks in the section become active again.
When you drop a whole project, its sections are dropped too.
Deleting sections and Sections Last
- iPhone and iPad: When you delete a section, Locus asks what to do. Move subtasks to parent deletes the section and moves its tasks to the top level of the project. Delete Section and all subtasks deletes the section together with its tasks.
- Mac: Choose Delete in the shortcut menu, or press ⌘⌫, to delete the section and its tasks. You can undo with ⌘Z.
Sections Last moves all top-level sections to the end of the project, so tasks that aren’t in a section come first. On iPhone and iPad, the button appears at the bottom of the project page only when it’s needed. On the Mac it’s in the toolbar and in a section’s shortcut menu.
Parent and subtask constraints
To keep subtasks within the bounds of their parent, Locus enforces these rules:
| Property | Rule |
|---|---|
| Due date | A subtask’s due time can’t be later than its parent’s. While the parent has a due date, the subtask’s due date can’t be cleared. |
| Defer date | A subtask’s defer date can’t be earlier than its parent’s. While the parent has a defer date, the subtask’s defer date can’t be cleared. |
| Plan date | A subtask’s plan date, including its end, can’t be later than the last day of its parent’s plan, though it can be earlier. Clearing a subtask’s plan date means it follows the parent: the subtask moves to the first day of the parent’s plan, and Locus shows “Inherits plan date from parent”. |
| Flag | When a parent is flagged, its subtasks are flagged too and can’t be unflagged on their own; Locus shows “Cannot Remove Flag”. |
If you give a single subtask a date outside these bounds, for example by using the shortcut menu to set a due date later than its parent’s, Locus shows “Exceeds parent’s due date” and keeps the existing value. When you change several tasks at once, out-of-range dates are adjusted to fit instead.
When you change a parent task, its subtasks follow:
- Due and defer dates: The new value is written to every subtask below it, still subject to the rules above.
- Plan date: Subtasks with no plan date, or whose plan started on the parent’s old start day, move to the new start day and keep their time and length. Subtasks planned on other days stay where they are but are kept within the new range. When you clear the parent’s plan date, the subtasks that followed it are cleared too.
- Flag, action list and project: The change applies to every subtask below it.
When you move a task under a different parent:
- If the task has no due or defer date, it takes the new parent’s. Existing dates are adjusted to fit, and the plan date is recalculated for the new parent.
- If the new parent is flagged, the task is flagged. If the new parent has an action list, the task takes that list.
- The task and its subtasks move to the new parent’s project.
- When an active or dropped task is moved under a completed parent, that parent becomes active again. Its parent tasks, and its project if the project is completed or dropped, become active too, so a completed task never ends up holding an active subtask.
- An active task moved under a dropped parent becomes dropped with it.
These rules apply only between parent tasks and their subtasks. A project’s due date doesn’t restrict the dates of the tasks in it.
Duplicating, converting and deleting
Duplicating a task
- iPhone and iPad: Touch and hold a task and choose More › Duplicate. After selecting several tasks, you can also choose Duplicate under More.
- Mac: Choose Duplicate in the shortcut menu, or Duplicate Tasks when several tasks are selected.
The copy includes the whole subtask tree, has the same title, and is placed right after the original. Dates, tags, notes, attachments, custom notifications, the repeat rule and the action list are kept. Every copied task is set to Active, and alarms aren’t copied. When you duplicate a subtask of a completed parent, the copy is active, so that parent, its own parent tasks and its project become active again too.
Convert to Project
When a task turns out to need several steps, you can turn it into a project. On iPhone and iPad, touch and hold the task and choose More › Convert to Project, or tap Convert to Project at the bottom of the editor. On the Mac, choose Convert to Project in the shortcut menu. After you confirm:
- The new project takes the task’s title, note and creation date.
- The task’s subtasks become top-level tasks in the project and keep their own subtasks.
- The original task is deleted. Its tags, dates, flag, action list, attachments and repeat rule aren’t carried over to the project.
On the Mac, converting can’t be undone.
Skip This Occurrence
Active repeating tasks have Skip This Occurrence in the touch-and-hold menu (the shortcut menu on the Mac). Locus creates the next occurrence and marks the current one as Dropped. Tasks that repeat When Done don’t have this command, because the next copy would be identical to the current one; if you no longer need such a task, drop it, which also ends the repeat. For the This Task Only and All Future Tasks choices you see when editing a repeating task, see Repeating tasks.
Deleting versus dropping
| Delete | Drop | |
|---|---|---|
| Result | The task and all its subtasks are removed permanently | The task is kept with the status Dropped |
| Shown in the Logbook | No | No; the Logbook shows completed tasks only |
| Can it be restored | Not on iPhone and iPad; on the Mac you can undo with ⌘Z | You can make it active again at any time |
| Repeating tasks | No further occurrences are created | The next occurrence isn’t created |
To see dropped tasks, create a custom filter with Complete Status set to Dropped.
Check before you delete
iPhone and iPad don’t support undo. Deleting a single task from the touch-and-hold menu takes effect immediately, with no confirmation. Deleting a multiple selection asks you to confirm first, and subtasks of the selected tasks are deleted too.