Dates: plan, due and defer ​

iPhone iPad Mac

Every task can have three kinds of date. The plan date is when you intend to work on it, the due date is when it must be finished, and the defer date is when it can start at the earliest. Each date affects a different thing: which day the task appears on in Schedule, whether it is available, and whether it is shown as overdue.

On this page

  • Only the defer date affects whether a task is available. Plan and due dates decide which day a task appears on in Schedule and Calendar.
  • When a plan date passes and the task is still open, the task keeps appearing in Schedule’s Today section. When a due date passes, the task is shown as overdue.
  • Due and defer dates can be all-day or have a specific time. A plan date can cover one day, several consecutive days, or a time slot within one day.
  • A subtask’s due date can’t be later than its parent’s, its defer date can’t be earlier than its parent’s, and its plan date can’t be later than the last day of the parent’s plan.
MonTueWedThuFriSatSun
Not available yet
Defer until
Plan
Due
Overdue
Defer date

Before this date the task is unavailable and does not appear in actionable lists. Use it for things you can’t start yet.

Plan date

The day or time slot when you intend to work on the task. It determines where the task appears in Schedule and Calendar.

Due date

The deadline by which the task must be finished. Tasks still open after this time are shown as overdue.

A task can have all three dates. The task shown here can start on Tuesday, is planned for Wednesday and Thursday, and must be finished by Friday.

Three date types ​

Plan dateDue dateDefer date
MeaningThe day or time slot when you intend to work on the taskThe deadline by which it must be doneThe task can’t start before this
Affects availabilityNoNoThe task is unavailable until the defer date arrives
In Schedule and CalendarAppears on every day of the planAppears on the due dayAppears on the day it is deferred to
After the date passesAn open task moves to Schedule’s Today sectionThe task is shown as overdue and listed under Past in Schedule (Overdue on the Mac)The task becomes available and no longer appears in Schedule for that date
Sends a notificationOn iPhone and iPad, when the plan startsYesNo
Takes the task out of the InboxYesYesNo

A task can have all three dates or only one of them. There is no need to fill in all three to make a task appear today; choose the one that best describes the situation.

Plan date ​

The plan date is time you set aside for yourself, and you can change it whenever you like. It can be a single day, a run of consecutive days (for example Wednesday to Friday), or a time slot within one day (for example Wednesday from 9:00 to 11:00). A plan that spans several days is shown once on each day in the range. These are repeated appearances of the same task; no extra tasks are created.

When a plan date passes and the task is still open, Locus keeps listing the task in Schedule’s Today section, and includes it when you look at today in Calendar’s list mode, so you can reschedule it. A plan date that has passed doesn’t by itself make a task overdue. In Calendar’s date markers the task still appears on the day it was originally planned. Completed tasks are not moved to today.

Starting with version 2.6.1, on iPhone and iPad, Locus sends a notification when a plan starts: a plan with a time reminds you at its start time, an all-day plan reminds you at 9:00 on its first day, and the end of a plan doesn’t send a reminder. See Reminders, alarms and notifications.

To review these tasks together, use the Date Status condition in a custom filter: Pending matches tasks whose plan lies entirely in the past, and Planned Today matches tasks whose plan includes today.

Due date ​

A task that is still open after its due date is shown as overdue. In Schedule, tasks due before today are listed under Past (Overdue on the Mac). A task due earlier today whose time has already passed stays in Today and also counts as overdue.

Use due dates only for real deadlines. If you want to work on something on a particular day without a deadline, give it a plan date instead, so that genuine deadlines don’t get lost among ordinary plans. Locus sends a notification when a task is due; see Reminders, alarms and notifications.

Defer date ​

A defer date suits work you can’t start yet, such as paperwork that can only be done next month. Until the defer date arrives, the task is unavailable and doesn’t appear in views that show only actionable tasks, such as the Inbox’s Available Tasks or a project’s Available view. It is still visible when you choose Remaining or All. Once the defer date arrives, the task becomes available again automatically. For the full availability rules, see Tasks and subtasks.

A defer date doesn’t take a task out of the Inbox and doesn’t send a reminder. If you want a notification at a particular time, set a due date or a custom reminder.

A repeating task without a due date or plan date uses the defer date for its next occurrence: when you complete it, the new task is deferred until the next date in the rule and stays unavailable until then. With the When Done repeat type, the new task keeps the same dates instead. See Repeating tasks.

All-day and timed dates ​

Locus has no separate all-day switch. A date without a time is all-day; once you add a time, that moment applies. All-day means something slightly different for each date:

DateAll-day meansWith a specific time
Due dateThe task can be finished at any point that day and only becomes overdue once the day is over. The due reminder arrives at 9:00 that dayThe task is due at that moment, and the reminder arrives then. Adding a time to an all-day due date starts from the Default Due Time
Defer dateThe task becomes available at 0:00 that dayThe task becomes available at that time. Adding a time starts at 9:00
Plan dateCovers one day or several consecutive daysA time slot within one day. Adding a time starts with 9:00 to 18:00

A timed plan must start and end on the same day. To cover several days, use an all-day plan.

When you change a date, Locus keeps it all-day or timed as it was. For example, moving an all-day due date to tomorrow keeps it all-day, and moving a task due at 15:00 to tomorrow keeps the 15:00 time.

Default due time ​

When you add a due date without choosing a time, Locus uses the Default Due Time, which is 21:00 unless you change it:

  • iPhone and iPad: Settings › Preference › Default Due Time
  • Mac: Settings › General › Default Due Time

The setting is stored on each device separately. It is used in these situations:

  • When you add a due date in the task editor or the inspector, it starts at today at this time, or tomorrow if that time has already passed today.
  • When you choose Due Today or Tomorrow from a quick-date menu for a task that has no due date, and when you use the due-date quick buttons in the Mac inspector.
  • When you add a task to a particular day from Schedule or Calendar and the new task gets a due date (depending on your settings). If the day is today and the default time has already passed, the next full hour is used instead; after 23:00, tomorrow is used.

In the iPhone and iPad editor, a new plan date starts as today (all-day) and a new defer date starts as tomorrow (all-day).

Setting dates on iPhone and iPad ​

In the task editor, tap Due, Plan or Defer in the quick bar at the bottom, and the matching date row appears in the editor. Tap the date on the right of the row to open the picker. Tap the name on the left of the row (for example Due) to remove that date.

Due and defer dates

  • The picker shows a calendar with Time below it.
  • An all-day date shows Add time; tap it to add a time.
  • A timed date has a Remove time button; tap it to make the date all-day again.

Plan date

  • Tap the first day and then the last day to plan several consecutive days. Tap a single day to plan only that day.
  • Tap Add time to set start and end times on that day, in 15-minute steps.
  • Tap Remove End Date to drop the end of the plan and keep only the start.

In the date row, an all-day date shows only the date, for example 09/21 or 09/21-09/23; a timed date also shows the time, for example 09/21 9:00-11:00. You can change how dates are written in Settings › Preference › Date Format.

If the plan date is later than the due date, the dates area shows “Plan date is later than due date”. When you save, Locus asks again with Plan Date Exceeds Due Date; you can go back and change it, or choose Save Anyway.

In iOS 26 and later, the due-date row also has a bell icon that switches the due reminder to an alarm. See Reminders, alarms and notifications.

Setting dates on the Mac ​

In the inspector’s Dates group, Due, Plan and Defer each have their own row. Click the value on the right to open the date panel.

  • Due and Defer: the panel has a calendar, an All Day option and a time. The quick buttons Today, +1d, +1w and +1mo count from today rather than adding to the current date; a due date lands at the Default Due Time and a defer date at 0:00. Click Set to confirm or Clear to remove the date.
  • Plan: click the first day and then the last day in the calendar. Click Add time to set start and end times on the same day, or Remove End Date to drop the end. Click Done when you are finished.

Changes in the inspector need to be saved: press ⌘↩ to save or Esc to cancel.

When you select a row in a task list, buttons such as Due, Plan and Defer appear in the row so you can set them directly. In the Quick Add panel, press ⌥⌘D for the due date and ⌥⌘S for the plan date, or write the date in natural language in the title; see Quick capture.

Quick-date menus ​

You can set dates without opening the editor. Touch and hold a task on iPhone or iPad, or Control-click it on the Mac, and use the Due Date and Plan Date submenus:

SubmenuiPhone and iPadMac
Due DateDue Today, Tomorrow, Other Date…, ClearToday, Tomorrow, Other Date…, Clear
Plan DatePlan Today, Tomorrow, Other Date…, ClearToday, Tomorrow, Other Date…, Clear

These commands follow a few rules:

  • Today and Tomorrow for a due date change only the day. An all-day due date stays all-day and a timed due date keeps its time. If the task had no due date, the Default Due Time is used.
  • Today, Tomorrow and Other Date… for a plan date set the plan to that one day, keeping the existing time (an all-day plan stays all-day). Any end date is removed.
  • Other Date…: on iPhone and iPad, the due date opens a calendar with a time, and the plan date lets you choose a day. On the Mac, the due date opens a calendar with a time and an All Day option, and the plan date opens the plan editor, where you can set several days or a time slot.
  • Events and sections don’t show these submenus.
  • There are no options such as “This Weekend” or “Next Week”; use Other Date… instead.

You can also set dates for several tasks at once: on iPhone and iPad, use the Date button in the multi-select toolbar; on the Mac, Control-click any of the selected rows. Schedule on the Mac can also move all overdue items to today in one step; see Today, Schedule and Flagged.

Dates of parent tasks and subtasks ​

A subtask’s dates must stay within the range its parent allows:

DateLimit for subtasks
Due dateNo later than the parent’s due date and time
Defer dateNo earlier than the parent’s defer date and time
Plan dateNeither the start nor the end can be later than the last day of the parent’s plan (the end day, if the parent’s plan spans several days). Earlier dates are fine

A project’s own due date doesn’t limit the dates of its tasks; only parent tasks do.

  • Choosing a date: when you pick a date for a subtask on iPhone or iPad, dates outside the parent’s range can’t be selected.
  • Using the quick-date menus: if you set a date outside the range for a single subtask, Locus rejects it with “Exceeds parent's due date” or “Exceeds parent's plan date”. When you change several tasks at once, dates outside the range are adjusted to fit without a message for each one.
  • Clearing a date: while the parent has a due or defer date, the subtask’s matching date can’t be cleared; Locus shows Cannot Clear Due Date, Cannot Clear Defer Date or “Inherits due date from parent”. If the parent has a plan date and you clear the subtask’s plan, the subtask goes back to the first day of the parent’s plan and Locus shows “Inherits plan date from parent”.
  • Changing the parent: a new due or defer date on the parent is written to all of its subtasks (adjusted to fit). When you change the parent’s plan date, subtasks with no plan, or with a plan on the parent’s old start day, move to the new start day and keep their own times and length. Subtasks planned for other days stay put and are adjusted only if they fall outside the new range.
  • New subtasks take the parent’s due, plan and defer dates, along with its flag and action list.
  • Moving a task under another parent: a task without a due or defer date takes the new parent’s, and dates outside the range are adjusted.

Events ​

You can turn a task into an event to record something with a fixed start and end, such as a meeting, a class or a flight.

  • iPhone and iPad: choose Event at the top of the task editor, where you can switch between Task and Event.
  • Mac: click the type button next to the title in the inspector to switch between Type: Task and Type: Event.

An event replaces the due, plan and defer dates and the duration with a start and an end time (Start At and End At on iPhone and iPad, Starts and Ends on the Mac). Events follow these rules:

  • Default times: if the task already had a due date, the start uses it (an all-day due date becomes 9:00 that day); otherwise the start is the next full hour. The end defaults to one hour after the start.
  • The end can’t be earlier than the start, but an event can run past midnight, for example from 22:00 to 1:00 the next day.
  • Changing the start: moving the start to another day moves the end with it, so the length stays the same. Changing the start within the same day leaves the end where it is; if the end would then be earlier than the start, it becomes one hour after the start.
  • Turning a task into an event clears its plan and defer dates.
  • An event sends a notification at its start time, appears in Schedule and Calendar on its start day, and is shown as a block on the timeline.
  • Events can have subtasks and can be subtasks; the parent date limits apply to them too. Sections can’t be events.

An event in Locus is part of your task data, so it can belong to a project and have tags and a flag. It is different from an event in Apple Calendar; see Calendar and timeline for how the two compare.